Minimum Time to Fulfill Orders
Myntra's fulfillment centers handle a massive volume of orders daily. To optimize customer satisfaction and operational efficiency, it's crucial to minimize the total time taken to process all pending items. We have multiple processing units, each with a specific time it takes to process a single item. This problem focuses on determining the shortest possible time required to process a given total number of items by leveraging these units in parallel.
Implement a function minTimeFulfillOrders that calculates the minimum time required to process totalItems given an array of processingTimes. Each value processingTimes[i] represents the time (in minutes) the i-th processing unit takes to process one item.
processingTimes: An array of positive integers, where processingTimes[i] is the time (in minutes) the i-th processing unit takes to process one item.totalItems: A positive integer representing the total number of items that need to be processed.totalItems.processingTimes[i] minutes. If a unit works for T minutes, it can process floor(T / processingTimes[i]) items.T such that the sum of items processed by all units in T minutes is greater than or equal to totalItems.Examples
Example 1
Input:
processingTimes = [1, 2, 3], totalItems = 5
Output:
3
Note:
At time = 1: Unit 1 processes 1 item. Total 1 item. At time = 2: Unit 1 processes 2 items, Unit 2 processes 1 item. Total 3 items. At time = 3: Unit 1 processes 3 items, Unit 2 processes 1 item, Unit 3 processes 1 item. Total 5 items. Since 2 minutes is not enough (only 3 items) and 3 minutes is enough (5 items), the minimum time is 3.
Example 2
Input:
processingTimes = [1, 2, 3], totalItems = 10
Output:
6
Note:
At time = 5: Unit 1 processes 5 items, Unit 2 processes 2 items, Unit 3 processes 1 item. Total 5 + 2 + 1 = 8 items. Not enough. At time = 6: Unit 1 processes 6 items, Unit 2 processes 3 items, Unit 3 processes 2 items. Total 6 + 3 + 2 = 11 items. This is >= 10. Since 5 minutes is not enough and 6 minutes is enough, the minimum time is 6.
Example 3
Input:
processingTimes = [1000000000], totalItems = 500000
Output:
500000000000000
Note:
With only one unit taking 10^9 minutes per item, to process 500,000 items, it will take 500,000 * 10^9 = 5 * 10^14 minutes.
Constraints
1 <= processingTimes.length <= 10^51 <= processingTimes[i] <= 10^91 <= totalItems <= 10^6number type, up to 2^53 - 1).check function for binary search effectively.Loading editor...