Minimize Maximum Project Load
In large-scale software development, efficient project planning and resource allocation are crucial to prevent team burnout and ensure timely delivery. When a set of projects needs to be assigned to a limited number of development teams, it's vital to distribute the workload as evenly as possible. This problem challenges you to find an optimal assignment strategy to minimize the maximum workload any single team has to bear.
You are given an array projectDays, where projectDays[i] represents the estimated number of person-days required to complete the i-th project. You also have numTeams, the total number of development teams available. Your task is to assign all projects to these numTeams such that:
projectDays must be assigned entirely to exactly one team.projectDays[i] and projectDays[j] (where i < j) are assigned to the same team, projectDays[i] must be completed before projectDays[j] by that team. More importantly, when forming contiguous blocks of projects for teams, you cannot reorder projects.Implement a function minimizeMaxProjectLoad that returns this minimum possible maximum load.
Input:
projectDays: An array of non-negative integers representing the person-days required for each project. projectDays[i] is the person-days for the i-th project.numTeams: A positive integer representing the number of available development teams.Output:
projectDays be empty? Yes, if projectDays is empty, the maximum load is 0.numTeams is greater than or equal to the number of projects? In this scenario, each project can potentially be assigned to its own team, or a few projects can be combined. The goal remains to minimize the maximum load. The minimum possible maximum load would be the maximum individual project's person-days.numTeams is 1? All projects must be assigned to the single team, so the maximum load will be the sum of all project days.projectDays[i] can be 0, but it will be non-negative.Examples
Example 1
Input:
projectDays = [10, 20, 30, 40], numTeams = 2
Output:
60
Note:
If we assign projects [10, 20, 30] to Team 1 (total 60 days) and [40] to Team 2 (total 40 days), the maximum load is 60. No assignment can achieve a maximum load less than 60 while keeping projects in order.
Example 2
Input:
projectDays = [1, 2, 3, 4, 5, 6, 7, 8, 9], numTeams = 3
Output:
17
Note:
One optimal assignment is: Team 1: [1, 2, 3, 4, 5] (total 15), Team 2: [6, 7] (total 13), Team 3: [8, 9] (total 17). The maximum load is 17. It's not possible to achieve a maximum load of 16 or less with 3 teams.
Example 3
Input:
projectDays = [100], numTeams = 5
Output:
100
Note:
With only one project, it must be assigned to one team, resulting in a load of 100. Even with 5 teams, this is the minimum possible maximum load.
Example 4
Input:
projectDays = [], numTeams = 1
Output:
0
Note:
An empty list of projects means no work, so the load is 0.
Constraints
0 <= projectDays.length <= 10^50 <= projectDays[i] <= 10^41 <= numTeams <= 10^5projectDays will not exceed 10^9.check function.Loading editor...