Maximized Profit from Concurrent Project Selection
You are an operations manager at a consulting firm tasked with optimizing project assignments. Your firm has a limited number of consultants (or slots) who can work on projects simultaneously. Each project has a defined start and end time, along with an associated profit. Your goal is to select a subset of projects to maximize the total profit, adhering to the constraint that at most K projects can run concurrently at any given moment.
This problem is crucial for resource allocation and maximizing revenue in a capacity-constrained environment. Efficiently solving it requires careful consideration of project timelines and profitability.
Implement the maximizeProfit function which takes a list of projects and an integer K (maximum concurrent projects) as input. The function should return the maximum total profit achievable by selecting projects under the given constraint.
Deliverables:
maximizeProfit function.K concurrency limit.projects: An array of arrays, where each inner array [start_time, end_time, profit] represents a project. start_time, end_time, and profit are positive integers.K: An integer representing the maximum number of projects that can run concurrently. K will always be a positive integer.start_time up to, but not including, end_time. That is, [s1, e1, p1] and [s2, e2, p2] are considered concurrent if their intervals [s1, e1) and [s2, e2) overlap. A project ending at t frees up its slot at time t. A project starting at t occupies a slot from time t.K will always be at least 1.Examples
Example 1
Input:
projects = [[1,5,10], [2,7,15], [6,10,12]], K = 2
Output:
37
Note:
Projects: P1=[1,5,10], P2=[2,7,15], P3=[6,10,12]. K=2. Sorted by start_time. We iterate through projects, greedily selecting if slots are available or replacing a lower-profit active project if full.
Example 2
Input:
projects = [[1,4,20], [2,5,10], [3,6,30], [4,7,40]], K = 2
Output:
90
Note:
Projects: P1=[1,4,20], P2=[2,5,10], P3=[3,6,30], P4=[4,7,40]. K=2. Sorted by start_time.
Example 3
Input:
projects = [[1,3,10], [1,2,5], [2,4,12]], K = 1
Output:
12
Note:
Projects: P1=[1,3,10], P2=[1,2,5], P3=[2,4,12]. K=1. Sorted by start_time (P2, P1, P3 to handle ties consistently).
Constraints
1 <= N <= 10^5 (number of projects)1 <= K <= N (maximum concurrent projects)1 <= start_time < end_time <= 10^91 <= profit <= 10^9number in TypeScript/JavaScript) for sums.start_time >= end_time). Assume valid inputs as per constraints.O(N log N) time complexity and O(N) space complexity?Loading editor...