In project management, visualizing task timelines is crucial for tracking progress and identifying dependencies. For our internal project management tool, we need a simple, interactive Gantt chart component to display the duration and schedule of various tasks. This problem focuses on building the core rendering logic for such a component.

What you need to do / Task

Your goal is to build a React component that displays a list of project tasks on a timeline, resembling a basic Gantt chart.

  1. Render a Date Header: Display a daily header for a predefined two-week period. Each day should be clearly visible.
  2. List Tasks: On the left side, list the names of all provided tasks.
  3. Visualize Task Durations: For each task, render a horizontal bar on the timeline corresponding to its startDate and endDate. The bar's position and width should accurately reflect the task's duration and placement within the two-week timeline.
  4. Highlight Today: Visually distinguish the current date on the timeline header.

UI/UX expectations

  • The overall layout should be a grid-like structure, with task names on the left and the timeline visualization on the right.
  • Each day in the header should have a consistent width.
  • Task bars should be easily distinguishable (e.g., different background color).
  • The "Today" column should have a distinct background or border to highlight it.
  • The component should be responsive enough to display all elements clearly within a reasonable viewport.

Acceptance criteria

  • The date header shows all days from START_DATE to END_DATE (inclusive).
  • Each task from mockTasks is listed on the left.
  • Each task has a corresponding visual bar on the timeline.
  • Task bars accurately start and end at their respective dates.
  • The width of a task bar correctly represents its duration (e.g., a 3-day task is three times wider than a 1-day task).
  • The current day's column in the header is visually distinct.

Constraints

Constraints & assumptions

  • The timeline will cover a fixed period of 14 days (two weeks), defined by FIXED_START_DATE and FIXED_END_DATE constants.
  • Tasks will always have valid startDate and endDate strings in YYYY-MM-DD format.
  • All task dates will fall within or partially overlap the FIXED_START_DATE and FIXED_END_DATE of the chart.
  • No drag-and-drop functionality is required.
  • No task editing or creation is required.
  • The component should handle a small number of tasks (e.g., 5-10 tasks).
  • Use React functional components and hooks.

Out of scope

  • Scrolling horizontally for longer timelines.
  • Zooming in/out on the timeline.
  • Handling task dependencies or complex relationships.
  • Backend integration or data fetching.
  • Extensive error handling for invalid dates.

What interviewers evaluate

  • Correctness and Accuracy: Does the Gantt chart accurately represent task durations and positions on the timeline? Is today's date correctly highlighted?
  • Code Structure and Readability: Is the code well-organized, modular, and easy to understand? Are appropriate React patterns used?
  • Problem Decomposition: How effectively is the problem broken down into manageable parts (e.g., date calculation, rendering logic)?
  • Styling and UI Implementation: Does the UI meet the basic expectations for layout and visual clarity using CSS?